ISO 9001:2008 W/DESIGN
CONTACT US AT 330.929.3333

Machine Quote Request Form

When filling out the Machine Quotation Request Form, please be aware that the options listed may not be available on all machine models. A Union Process representative will contact you to discuss your quote request in detail after receiving the form.

* Required fields
 
* Company Name:
* Mailing Address:
* City:
  
State/Province:
  
Zip/Postal Code:
* Country:
Contact Information
* Contact Name:
* Title:
* Phone:
   Fax:
* Email Address:

Mill Model
Model:
Time Frame to Purchase :
   
Materials to be Processed
Product:
Starting Size:
Target Size:
Batch Size:
Specific Gravity:
Bulk Density:
Desired Throughput: per hour    per year (@ hrs./year )
Wet or Dry? Wet       Dry
If wet – Solvent:
If wet – pH Level:
If dry – Dry Grind Aid:
   
Sensitivity of Material
Product Color Critical: Yes    No
Iron Contamination Critical: Yes    No
Other Critical Contamination: Yes    No   
   
Electricals (Indoor Use)
Voltage (see note 1):

Non-Hazardous (see note 2)       Hazardous (see note 3)

   
Notes:
1.

Select your voltage requirements from the drop down list . If yours is not listed, select "Other" and the factory will contact you.

 
 
2.

Standard


Variable
Speed:

Motor - 2 Speed, TEFC, 450% starting torque.
Controls - 2 Speed, NEMA 12 enclosure, machine mounted and wired.

Motor - Inverter duty, TEFC.
Drive - VFD, NEMA 12 enclosure, machine mounted and wired.
(some sizes available in NEMA-4X/12 enclosure)

 
 
3.

Standard



Variable
Speed:

Motor - 2 Speed, explosion-proof, 450% starting torque.
Controls - 2 Speed, NEMA 7/9 enclosure, explosion-proof, machine mounted and wired.

Motor - Inverter duty, explosion-proof.
Operator Station - NEMA 7/9 enclosure, explosion-proof, machine mounted.
Drive - VFD, NEMA12 enclosure, non-explosion proof. Must be customer mounted in a non-hazardous area. Wiring to machine and operator station by customer.

 
Explosion-proof is for Class I, Division 1, Group D, Class II, Division 1, Groups F/G areas. (Other hazardous area classifications are available on request)
     
Tank

Material (see note 4):

Jacket (see note 5):
Arms (see note 6):
   
Notes:
4.
On production size units, The standard tank is stainless steel. AR steel is available as an option. Ceramic, Polyurethane and plastic lined tanks are available for other mills.
 
 
5.
Standard jacket is designed for maximum 10 psig. ASME coded vessels for higher pressure are available on request.
 
 
6.
Standard agitator arms are made from hardened tool steel or stainless steel. Optional: Can be nickel hard-faced or have tungsten carbide, polyurethane, plastic or ZR02 sleeves.
     
Tank Cover

Other:

   
Pumping System
 
   
Grinding Media

Size and Type Required:

   
How Did You Hear About Us? (check all that apply)
  Google – list keyword if remembered:
ThomasNet.com
Magazine Ad – name of publication:
Press Release
Trade Show – name of show:
E-Blast
E-Newsletter
Bing Search
Yahoo! Search
Referral from colleague
Past customer
 
Modifications or Additional Components

Quotation Standards:

All units quoted F.O.B. Union Process
Machine Quotations are valid for 60 days from date of quote.
Payment Terms:

USA & Canada

  All Other

Laboratory Units:

Production Units:

net 30 days

30% Down with order
40% Prior to ship
30% Net 30 days

 

Letter of credit or wire transfer before shipment


Security Code:
Please enter the words you see in the box, in order and separated by a space.



Copyright © 2014 Union Process. All rights reserved.